UIC UNIFE FP7

Achieved Results and INESS Deliverables open to public

INESS Deliverables open to public

WS B
Business Model (Leader: DB)

Summary on value chain mapping of interlocking systems
Report on Life Cycle based cost model for interlocking systems
Summary on classification scheme for line categories
Report on market specific cost drivers
Report on cost saving potential of standards in the interlocking life cycle
Specification of business model(s)
Report on applicability of business model and future cooperation perspectives

WS C
System Design (Leader: Bombardier)

Report on data model definition, needed adaptions and applicabililty

WS D
Generic Requirements (Leader: ProRail)

Signaling Glossary
Requirements expression document
Requirements interface definition document
Catalogue of commands and statuses
Report on translation of requirements from text to UML
Guideline which clarifies the relationship between the deliverables D.2
Report on experience with ERTMS installations
Documented strategy for Verification and Validation
Documented methods for expressing test cases in UML
Generic test cases
Report to assist requirements’ review and document methods and tools used
Methodology for invariants derivation in a formal format
Prototype of a tool for the verification of invariants in a formal format
Documented verification of the model invariants in a formal format

WS E
Functional Architecture and Interfaces (Leader: Trafikverket)

Safety constraints from the interfaces point of view
Report on the information collected from various railways and/or suppliers about the ETCS
Report on the current information Migration and fall back strategies
Propose one or several harmonised structure(s)
Final Report of trackside migration strategies from Task E.4.2
Final Report of fallback possibilities and benefits from Task E.4.3

WS F
Testing and Commissioning (Leader: Network Rail)

General model and preliminary Template
Test and Commissioning methods and tools recommendation Handbook

WS G
Safety Case Process (Leaders: Funkwerk/ TUBS)

Normative Safety Case Process Analysis
Definition of long term goals
Definition of short term goals
Cost Reduction Potentials for the improved Safety Case Process
Process Description analysis report
Software Requirements Specification Description Analysis Report
Specification of the Improved Safety Case Process
Specification of tools
Developed tool
Evaluation Report
Information material and questionnaire
Back to the top Context & Object | Organisation | Partners & (...) | Technical Informatio | Achieved Results | Publications, News | Publication Material | INESS Final Conferen | Three-day training | Presentation in (...) | Follow site activity RSS 2.0